Elevator control tube connection...

Post a reply

Smilies
:D :) ;) :( :o :shock: :? 8-) :lol: :x :P :oops: :cry: :evil: :twisted: :roll: :!: :?: :idea: :arrow: :| :mrgreen: :geek: :ugeek:

BBCode is ON
[img] is ON
[flash] is OFF
[url] is ON
Smilies are ON

Topic review
   

Expand view Topic review: Elevator control tube connection...

Re: Elevator control tube connection...

by beechdrvr » Mon Dec 12, 2022 7:40 pm

I saw your pictures. I think I may just construct it like the control yokes. Mill a radius in the end, bend a u-Channel then straps welded along side. I just can’t see any engineering benefit/difference from either of the drawings. Guess just different ways of skinning the same cat.

Re: Elevator control tube connection...

by Bitshifter » Mon Dec 12, 2022 6:15 pm

I thought the same until I made the part. When you cut the V into the square tube it gives a perfect line to weld on. I think it's an easier weld than the drawing you referenced.

Elevator control tube connection...

by beechdrvr » Mon Dec 12, 2022 4:18 pm

Curious what others have done. The plans call for a piece of 3/4" sq tubing to be affixed to the end of a piece of 3/4" round tube. That presents a sort of round peg, square hole scenerio.
IMG_8216.jpg
IMG_8216.jpg (2.63 MiB) Viewed 58 times
My question is, why can't it be something along the lines of what the plans for the Acrosport show. I really so no apparent reason it couldn't be. Am I missing something?
IMG_8217.jpg
IMG_8217.jpg (3.24 MiB) Viewed 58 times

Top